Helical Piles
CASE HISTORY #19960524-A
May 5, 1996
Project ASU Aquatic Ctr. Commercial NC
Engineer/Architect GaborLorantArchitect Cary Stoneman
Underpinning Contractor Azizona Helical-Piers Co. Phoenix, AZ
Job Description: The location is the Mona Plummer Aquatic Center at Arizona State University. The project: To secure the diving platforms. The helical pier was found to be the best method in obtaining a deep foundation.
New Contruction: Helical anchors in new construction are being specified more and more by architects and engineers alike throughout the world.
Note: It’s a surefire method for avoiding litigation over settlement problems due to improper soil compaction, expansive soils, poor drainage and/or landscape designs, etc.

Arizona State University

Dive platforms, Mona Plummer Aquatic Center

After the piers are installed to specific pre-engineered capacities, load caps are attached to the top of the shafts. This is for the purpose of tying-in the pier to the rebar before the footing is poured.